PROJECTS
RCPA
- COBBLE BANK
Scope of works
For this particular project prior to our arrival the previous contractor had tried to dig out the boxed sections to avoid drilling but soon realised there was rock and they couldn’t get down to the required depth so we were contacted to rock drill but eventually took on the whole project which included the installation of H beams and Link slabs. Upon our arrival we insisted on filling the trenches with concrete to ensure the retention system will be tidy and structural. install of retention system for above ground storage bins.
This work was provided so the client had bigger and stronger ground storage bins for their materials.
