PROJECTS

INTEGRATED GREEN CONSTRUCTIONS

- PRESTON

Scope of works

DMAC was engaged to instal Driven piles to support a large holding tank for a food works company. The site had sustained damage by fire and a speedy install was required as the Food Company was haemorrhaging profit on a daily basis. The piles were driven using steel pipe in 6 meter sections by an Excavator mounted EMV. The steel pipe was welded together as the instal progressed. Some of the piles ended up going to 18m.