Scope of works
For this project DMAC were called in to install casings for a new shade sail at a bowls club. Due to soft ground conditions, driven piles (casings) were the selected method for this job. Using an EMV (Excavator Mounted Vibrator), we installed eight 6.5m x 650mm diameter casings into the ground. Then they are partially drilled out and concreted after installing the cage and rag bolt assembly before the structure is built on top.