Scope of works
Amongst the daily hustle of Fitzroy St, DMAC could be seen piling from sun up to sun down. 56 piles with depths down to 9.3m drilled in pendulum set up to allow piles to be drilled hard against neighboring walls. Some challenging ground conditions were experienced on this site that varied from one side of the site to the other. We worked through this with our client and adopted some new methods to get the job completed. Working with our clients thinking outside the norm is what we love to do!