How CFA piling works
CFA piling creates a concrete deep foundation using a continuous flight auger. The auger is drilled to the designed founding depth, then concrete is placed through the hollow centre of the auger as it is withdrawn. This forms the concrete pile within the ground while the drilling tool is removed.
CFA piling for Melbourne and Mornington Peninsula projects
CFA piling may be considered for foundation works on residential, townhouse, basement and commercial projects across Melbourne and the Mornington Peninsula. It can be a relevant option where a project team is assessing deep foundation requirements and where site conditions call for a specialist piling method.
On Mornington Peninsula sites, the selected approach should be confirmed from the project’s geotechnical report, structural documentation and site inspection. Sloping blocks, constrained access, excavation sequencing, nearby buildings and rock conditions may affect piling methodology. Where rock drilling, basement drilling or another foundation solution is relevant to the scope, DMAC Piling can discuss the available services with the project team.
Recorded CFA piling data
DMAC Piling records CFA installation data using a Jean Lutz system. The recorded information includes concrete volume, extraction speeds and a 2D image of the pier.
To help us understand your proposed works, please include as much of the following information as is available:
- Site address and a brief description of the proposed construction
- Structural-engineer drawings, footing details or pile schedule
- Geotechnical or soil investigation report
- Proposed pile diameters, depths and working loads, where already nominated by the engineer
- Site-access information, including driveway access, overhead constraints, neighbouring buildings, slope and excavation stage
- Any related requirements for basement works, retaining walls, rock drilling, monitoring or testing
If some documents are not yet available, contact DMAC Piling with the site address and project details to start the conversation.
CFA Piling FAQs
What is CFA piling?
CFA stands for Continuous Flight Auger. It is a specialist piling method used to create concrete deep foundations by drilling with a continuous flight auger and placing concrete as the auger is withdrawn.
Does DMAC Piling provide CFA piling in Melbourne and the Mornington Peninsula?
Is CFA piling suitable for every site?
Can rock affect a CFA piling project?
What information should I send for a CFA piling enquiry?
What CFA piling data does DMAC record?
Related piling and foundation services
Every project has different ground, access and construction requirements. Depending on the proposed works, you may also need to consider related DMAC Piling services:
- Rock Drilling — where ground conditions require a specialist drilling approach.
- Foundation Design – D & C Proposals — for projects requiring a foundation solution to be developed around the proposed works.
- Basement Packages — for basement-related piling and drilling scopes.
- Retaining Walls — where retaining work forms part of the broader construction requirement.
- Bored Piers and Sheet Piling — alternative piling methods that may be relevant depending on the project.
Contact DMAC Piling with your drawings and site information to discuss which services may be relevant.
Replace the bracketed labels with internal URLs to the matching existing pages. This improves site architecture and helps AI systems connect DMAC’s service entities without keyword stuffing.
Discussing a CFA piling project with DMAC
1. Share the site address, proposed construction details and any available drawings or geotechnical information.
2. DMAC Piling reviews the information available for the proposed foundation works, including site access, ground conditions and any related drilling or basement requirements.
3. The CFA piling scope is considered alongside the project’s structural and geotechnical requirements.
4. If CFA piling proceeds, installation data is recorded using the Jean Lutz system, including concrete volume, extraction speeds and a 2D image of the pier.
This process is intended to help establish the information needed for a project discussion. The final piling approach should align with the project documentation and site conditions.