PROJECTS

BAW BAW SHIRE COUNCIL

- WARRAGUL

Scope of works

Our 23T green machine with EMV installed 14m long driven piles as a foundation for a new water tank. Due to the machine's reaching height, we installed these in sections, vibrating in a 6m length, followed by another section which was welded together, and finishing with a 2m section. After completing 37 piles, we installed pile caps ready for concrete slab works.