Scope of works
Using our 23T excavators, piling work commenced on-site with the drilling and installation of wells. This was done to help dewater the basement during piling and excavation. Following this, we drilled 600mm diameter retention piles to depths varying between 4.6m and 12m. Throughout the project, we collaborated closely with the builder and earthmovers to ensure the work was completed safely and on schedule.