PROJECTS

BALMAIN & CO

- HAMPTON

Scope of works

Our Tescar CF4 was set up in CFA mode, with our 13T offsiding, cleaning up and dropping cages. CFA method was adopted due to sandy soil conditions and our piles protruding into the water table, DMAC drilled down to a maximum depth of 13m for this basement design. Due to multiple piling platform heights and the need to cut and fill while piling, careful planning and execution were critical to ensure smooth operations and successful completion of this project.